Scripps Healthcare

La Jolla, California

Building 203/204 Shell & T.I.

Description

Installed new HVAC rooftop units and associated ductwork, natural gas piping and condensate drainage piping serving classrooms on 10 existing schools. Scope also included electrical service to the new HVAC units and structural upgrades to accommodate the new rooftop HVAC units.

Quick Facts

General Contractor: DPR Construction

Owner: The County of San Diego and The San Diego Regional Building Authority

Contract Amount: $6,530,430.00

Year to be Completed: 2018

Square Footage: 158,000 GSF

Architect: Smith Group JJR

Scripps Green Central Plant

Description

Our scope included the design and installation of the first OSHPD approved modular central plant which totaled 1500-tons of capacity. Temporary cooling towers and piping. A separate air-cooled chiller plant to serve non 24-hour operations. Remote cooling system for the emergency generators. Capable of reducing 48kw/ton, the efficiency of this plant brought much needed savings to the previous chilled water system and has provided a substantial rebate from SDG&E.  

Quick Facts

General Contractor: BSD Builders

Owner: Scripps Health 

Contract Amount: $5,950,000

Year Completed: 2012

Mechanical Engineer: Randall Lamb 

Memorial

Quick Facts

General Contractor: DPR Construction

Owner: Scripps Health

Contract Amount: $90,000

Year Completed: 2012

Square Footage:  GSF

Mechanical Engineer: SC Engineers. Inc

Description

Under construction.. check back later for more information